TRUSS DESIGN & MANUFACTURING

Framing Components

THE NEXT EVOLUTION IN CONSTRUCTION TECHNOLOGY

FrameFaster

For 40 years City Lumber has built roof and floor trusses. We have now pioneered pre-cut framing material packages to revolutionize your building process.

  • FRAME FASTER

    Using components allows you to build 2.5 more houses with the same crew

  • SAVE TIME & LABOR

    Components are pre-assembled in a facility, enabling quick and efficient installation by the job site crew

  • SUPERIOR SUPPORT

    Components are engineered and manufactured in a controlled environment using powerful design software and high-quality materials

  • CREATE LESS WASTE

    Components use 25% less wood product and creates 30x less job site waste

IMG 2563

OUR COMMITMENT

In a culture that is constantly reinventing itself we are committed to: Honoring the life breathed into us, putting others first, and doing things the right way.

If you would like to learn more about City Lumber’s Estimating & Truss Design Department and find out how we can save you time & money on your next job, contact us at 256-551-1125.

IMG_2702
CLumber033B
Estimating3